QUALITY POWER TESTING.COM

        Superior Service on Industrial Power and Control Systems

 

Home
Auto Transfer Switch
Ground Fault
Variable Freq. Drives
Service Intervals
QPT Field Engineer
Test Equipment
Pricing
About Us
Contact Info
Reader                         

 

 

 

    

 

Service Intervals

Preventative maintenance service intervals for Power Equipment is dependent on the type of load, service duty cycle, overload and severity of environment

 In general, Low and High Voltage Switchboard, Switchgear and MCC preventative maintenance should never exceed 5 years and a preferred service schedule is 3 years or sooner. For the Automatic Transfer Switch, Low Voltage Switch, Ground Fault Systems and Protective Relays, preventative maintenance should never exceed 3 years and a preferred service schedule is once a year or sooner.

If you have a specific maintenance requirement, please contact us.