Monitor and verify correct operation of the
following:
1)
Normal voltage sensing pickup and dropout.
2)
Emergency voltage sensing pickup and dropout.
3)
Emergency frequency sensing pickup and dropout.
4)
Override momentary outage time.
5)
Transfer to emergency time.
6)
Re-transfer to normal time.
7)
Generator set cool down time.
8)
and any accessory's as needed.
9)
Measure normal and emergency voltage.
10)
Measure current levels and determine percent of full load when
possible.
11)
Measure generator frequency.
12)
Energized functional check is performed on the ATS.